• 杏耀平台登录入口,杏耀平台代理注册,杏耀平台娱乐登录,杏耀平台登录地址

    CLIMAVENETA

    Projects APPLICATION
    ▶ locations:Home>Projects
    CLIMAVENETA

    Xiamen Haichen New Energy Technoiogy Co. LTD

    Area:Fujian System Type: Construction Area: Application Type:Industrial Process Cooling Capacity: Heating Capacity:

    Project:

    Cooling capacity: 2330kW, heat recovery capacity: 367kW, it is used in new energy power room and new material workshop, providing hot and cold water for air conditioning, dehumidification system and end of workshop. Heat recovery unit provides 55℃ hot water for dehumidifier regeneration heating.

    Installed Units:

    2X ERACS2102C-B-D 1X ERACS2402C-B

    Solution:

    The unit is used in new energy power room and new material workshop, providing hot and cold water for air conditioning, dehumidification system and end of workshop. Heat recovery unit provides 55℃ hot water for dehumidifier regeneration heating. Total cooling load: 2330kW

    Certification:

    Projects

    APPLICATION
    Projects

    Xiamen Haichen New Energy Technoiogy Co. LTD

    Area:Fujian System Type: Construction Area: Application Type:Industrial Process Cooling Capacity: Heating Capacity:

    Project:

    Cooling capacity: 2330kW, heat recovery capacity: 367kW, it is used in new energy power room and new material workshop, providing hot and cold water for air conditioning, dehumidification system and end of workshop. Heat recovery unit provides 55℃ hot water for dehumidifier regeneration heating.

    System Type:

    Installed Units:

    2X ERACS2102C-B-D 1X ERACS2402C-B

    Solution:

    The unit is used in new energy power room and new material workshop, providing hot and cold water for air conditioning, dehumidification system and end of workshop. Heat recovery unit provides 55℃ hot water for dehumidifier regeneration heating. Total cooling load: 2330kW

    Certification: