CLIMAVENETA

Beijing Xinxinyuan residential district nine-year system school

Area:Beijing System Type: Construction Area: Application Type:School / University Cooling Capacity:5000kW Heating Capacity:

Project:

The nine-year school project of Beijing Xinxinyuan Residential district adopts air-cooled screw heat pump unit as its cold source in summer and heat source in transition season.

Installed Units:

4×ERACS4822E-N-B

Solution:

The nine-year system school project of Beijing Xinxinyuan Residential District is an educational college project. Clement 4 Typhoon cold screw heat pump unit is used as its cold source in summer and heat source equipment in transition season to provide the required cold and heat load for each area of users. In winter, central heating is used to meet the heating demand.

Certification:

Projects

APPLICATION
Projects

Beijing Xinxinyuan residential district nine-year system school

Area:Beijing System Type: Construction Area: Application Type:School / University Cooling Capacity:5000kW Heating Capacity:

Project:

The nine-year school project of Beijing Xinxinyuan Residential district adopts air-cooled screw heat pump unit as its cold source in summer and heat source in transition season.

System Type:

Installed Units:

4×ERACS4822E-N-B

Solution:

The nine-year system school project of Beijing Xinxinyuan Residential District is an educational college project. Clement 4 Typhoon cold screw heat pump unit is used as its cold source in summer and heat source equipment in transition season to provide the required cold and heat load for each area of users. In winter, central heating is used to meet the heating demand.